<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>project-hospital | Air Cleaning Technologies</title>
	<atom:link href="https://www.aircleaningtechnologies.com/tag/project-hospital/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.aircleaningtechnologies.com</link>
	<description></description>
	<lastBuildDate>Wed, 23 Nov 2022 22:02:57 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://www.aircleaningtechnologies.com/wp-content/uploads/2020/04/cropped-site-identity-32x32.png</url>
	<title>project-hospital | Air Cleaning Technologies</title>
	<link>https://www.aircleaningtechnologies.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Ingalls Hospital, Chicago IL</title>
		<link>https://www.aircleaningtechnologies.com/ingalls-hospital-chicago-il/</link>
		
		<dc:creator><![CDATA[Pete Laiti]]></dc:creator>
		<pubDate>Mon, 27 Mar 2017 16:56:07 +0000</pubDate>
				<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[project-hospital]]></category>
		<guid isPermaLink="false">https://www.aircleaningtechnologies.com/?p=190</guid>

					<description><![CDATA[<p>ACT was contracted by Aramark Health Care four times to manufacture and assembly 12 custom, field-built AHU’s, totaling over 300,000 CFM. Units ranged from 10,000 to 40,000 CFM in capacity and included, thermal break casings, Merv-8 &#38; 14 pre-filters, face...</p>
The post <a href="https://www.aircleaningtechnologies.com/ingalls-hospital-chicago-il/">Ingalls Hospital, Chicago IL</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></description>
										<content:encoded><![CDATA[<p>ACT was contracted by Aramark Health Care four times to manufacture and assembly 12 custom, field-built AHU’s, totaling over 300,000 CFM. Units ranged from 10,000 to 40,000 CFM in capacity and included, thermal break casings, Merv-8 &amp; 14 pre-filters, face and bypass steam pre-heat coils, chilled water coils, humidifier manifolds, plenum fans, final blow thru HEPA filters and Belzona 5811 coating system.</p>The post <a href="https://www.aircleaningtechnologies.com/ingalls-hospital-chicago-il/">Ingalls Hospital, Chicago IL</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bellevue Hospital, NY</title>
		<link>https://www.aircleaningtechnologies.com/bellevue-hospital-ny/</link>
		
		<dc:creator><![CDATA[Pete Laiti]]></dc:creator>
		<pubDate>Mon, 27 Mar 2017 16:54:12 +0000</pubDate>
				<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[project-hospital]]></category>
		<guid isPermaLink="false">https://www.aircleaningtechnologies.com/?p=177</guid>

					<description><![CDATA[<p>Following Hurricane Sandy, ACT was contracted by Johnson controls to perform expedited design, production, and field assembly of six custom, field-built AHU’s totaling over 200,000 CFM. Units ranged from 20,000 to 40,000 CFM in capacity and included, thermal break casings,...</p>
The post <a href="https://www.aircleaningtechnologies.com/bellevue-hospital-ny/">Bellevue Hospital, NY</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></description>
										<content:encoded><![CDATA[<p>Following Hurricane Sandy, ACT was contracted by Johnson controls to perform expedited design, production, and field assembly of six custom, field-built AHU’s totaling over 200,000 CFM. Units ranged from 20,000 to 40,000 CFM in capacity and included, thermal break casings, steam pre-heat coils, chilled water coils, humidifier manifolds, direct drive plenum fans, final blow thru filters and marine-grade floor coating system.</p>The post <a href="https://www.aircleaningtechnologies.com/bellevue-hospital-ny/">Bellevue Hospital, NY</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UPMC-Pittsburg</title>
		<link>https://www.aircleaningtechnologies.com/upmc-pittsburg/</link>
		
		<dc:creator><![CDATA[Pete Laiti]]></dc:creator>
		<pubDate>Mon, 27 Mar 2017 16:53:42 +0000</pubDate>
				<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[project-hospital]]></category>
		<category><![CDATA[project-school]]></category>
		<guid isPermaLink="false">https://www.aircleaningtechnologies.com/?p=175</guid>

					<description><![CDATA[<p>ACT was contracted to perform AHU restoration on 6 of the 40-year-old custom AHU’s located in the penthouse of the Clinical Lab building at the University of Pittsburg Medical College. ACT was responsible for the AHU casing redesign and upgrade...</p>
The post <a href="https://www.aircleaningtechnologies.com/upmc-pittsburg/">UPMC-Pittsburg</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></description>
										<content:encoded><![CDATA[<p>ACT was contracted to perform AHU restoration on 6 of the 40-year-old custom AHU’s located in the penthouse of the Clinical Lab building at the University of Pittsburg Medical College. ACT was responsible for the AHU casing redesign and upgrade which included reinforcing the existing casing with structural steel to support new components arrangement. ACT also sealed the entire casing interior with marine-grade sealant and pressure tested each unit to prove maximum 1% case leakage at 12” wg static pressure.</p>The post <a href="https://www.aircleaningtechnologies.com/upmc-pittsburg/">UPMC-Pittsburg</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A Clean Bill of Health for Hospital Ducts</title>
		<link>https://www.aircleaningtechnologies.com/a-clean-bill-of-health-for-hospital-ducts/</link>
		
		<dc:creator><![CDATA[Pete Laiti]]></dc:creator>
		<pubDate>Fri, 03 Mar 2017 19:30:11 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[project-hospital]]></category>
		<guid isPermaLink="false">https://www.aircleaningtechnologies.com/?p=86</guid>

					<description><![CDATA[<p>A medical center recognized the need for a thorough duct cleaning, with particular attention to the the center’s surgical suites and surgical prep areas. The work required special knowledge of the healthcare environment and certified technicians to complete the work....</p>
The post <a href="https://www.aircleaningtechnologies.com/a-clean-bill-of-health-for-hospital-ducts/">A Clean Bill of Health for Hospital Ducts</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></description>
										<content:encoded><![CDATA[<p>A medical center recognized the need for a thorough duct cleaning, with particular attention to the the center’s surgical suites and surgical prep areas. The work required special knowledge of the healthcare environment and certified technicians to complete the work.</p>
<p>Understanding that contaminant-free air is of maximum importance in healthcare settings, and the center’s need to protect patients and staff, our team approached the project with care. We cleaned supply vents, where clean air comes into the facility, and return vents that take air back to the HVAC system. Our technicians also cleaned all of the system’s Variable Air Volume boxes, which supply airflow, and the reheat coils, which heat the air. We cleaned the diffusers (or vents) and grilles (the visible exterior portion of the vent) where air comes into the facility. Our technicians also vacuumed the air handling unit’s interior surfaces with a HEPA machine.</p>
<p>Finally, our team removed outdated fiberglass insulation from the HVAC unit’s fan and replaced it with new high-density closed-cell foam insulation designed to resist dirt and moisture and reduce the risk of accumulation mold or biological pathogens. The end result was a cleaner, safer environment for surgery and patient care and a satisfied client.</p>
<p><img fetchpriority="high" decoding="async" class="alignnone size-full wp-image-171" src="https://www.aircleaningtechnologies.com/wp-content/uploads/2020/04/equipment3.jpg" alt="" width="1000" height="750"></p>The post <a href="https://www.aircleaningtechnologies.com/a-clean-bill-of-health-for-hospital-ducts/">A Clean Bill of Health for Hospital Ducts</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hospital Air Handlers Boosts Efficiency</title>
		<link>https://www.aircleaningtechnologies.com/hospital-air-handlers-boosts-efficiency/</link>
		
		<dc:creator><![CDATA[Pete Laiti]]></dc:creator>
		<pubDate>Fri, 03 Mar 2017 19:29:34 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[project-hospital]]></category>
		<guid isPermaLink="false">https://www.aircleaningtechnologies.com/?p=82</guid>

					<description><![CDATA[<p>Valley Baptist Hospital, in Harlingen TX, working with Rhodes Engineering, was looking to upgrade its aging air handler system.The hospital didn’t have a comprehensive list of their existing air handler units and many units did not have the original design...</p>
The post <a href="https://www.aircleaningtechnologies.com/hospital-air-handlers-boosts-efficiency/">Hospital Air Handlers Boosts Efficiency</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></description>
										<content:encoded><![CDATA[<p>Valley Baptist Hospital, in Harlingen TX, working with Rhodes Engineering, was looking to upgrade its aging air handler system.The hospital didn’t have a comprehensive list of their existing air handler units and many units did not have the original design criteria.</p>
<p>ACT’s design group worked with the engineer of record to enhance air handling efficiency at Valley Baptist. We provided an accelerated air handling unit production schedule and assisted in the field verification of all existing units. ACT provided a “pre balance” report for each unit and worked with Rhodes to consider options and select air handlers that can accommodate present and future demands for the hospital. The new units were <strong>purchased through / manufactured by</strong> ACT and installed on a schedule that reduced downtime and minimized impact to the hospital’s most critical areas. Having a clear picture of the entire system has helped simplify maintenance of the new air handlers, reduce costs, and keep hospital patients, staff and visitors comfortable.</p>The post <a href="https://www.aircleaningtechnologies.com/hospital-air-handlers-boosts-efficiency/">Hospital Air Handlers Boosts Efficiency</a> first appeared on <a href="https://www.aircleaningtechnologies.com">Air Cleaning Technologies</a>.]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
