ACT was contracted by Aramark Health Care four times to manufacture and assembly 12 custom, field-built AHU’s, totaling over 300,000 CFM. Units ranged from 10,000 to 40,000 CFM in capacity and included, thermal break casings, Merv-8 & 14 pre-filters, face and bypass steam pre-heat coils, chilled water coils, humidifier manifolds, plenum fans, final blow thru HEPA filters and Belzona 5811 coating system.
Ingalls Hospital, Chicago IL
Filed Under: Featured Projects